As part of the landmark Te Ahu A Turanga Manawatu Tararua Highway project – we delivered multiple critical infrastructure packages utilizing our specialized trenching and installation capabilities. Our ITS scope involved trenching and installation of underground ducting networks to ensure safe highway operations. The pavement subsoil drainage scope encompassed extensive trenching and installation of subsurface drainage systems across the challenging terrain to protect the pavement structure and ensure long-term durability. Our stormwater drainage scope involved the installation of culverts, catch pits, and piped drainage networks across the 11.5km corridor to manage surface water runoff and protect the surrounding environment. This project was instrumental in reconnecting the Manawatu and Hawke’s Bay regions following the permanent closure of the Manawatu Gorge.
services@blackley.co.nz
213 Stoney Creek Road, RD10, Palmerston North, 4470