CivilPNCC Amberley Ave Watermain Replacement Project

IMG_8545

This industry-recognised project involved the full replacement of aging watermain infrastructure along Amberley Avenue on behalf of Palmerston North City Council. Drawing on the expertise of our skilled pipe-laying crews, we systematically removed the existing assets and installed new water mains, following the original alignment to minimise disruption while ensuring reliable long-term performance. Working within a complex shared trench profile containing numerous existing utilities, we successfully overcame these challenges by installing new valves and hydrants and undertaking rigorous pressure testing to confirm the integrity of the upgraded network. The project delivered a significant improvement in water supply reliability, pressure, and quality for the local community. Equally important, our innovative construction methodologies, strong focus on community engagement, and commitment to minimising disruption enabled us to complete the works efficiently and to a high standard—key factors that contributed to the project’s recognition within the industry.

https://blackley.co.nz/wp-content/uploads/2020/11/Footer-logo-white.png
213 Stoney Creek Road, RD10, Palmerston North, 4470

Follow us:

FREE CONSULTATION

Copyright © Blackley Construction Ltd.
All rights reserved.

Website by: GSA Design