CivilFletcher – Pek Peka to Otaki Expressway

Key features of the work and/or statistics:

  • Installation of the “Intelligent Transport System” (ITS), this is the new method of communicating traffic volumes, automatic reading of number plates and weighing of vehicles. Once completed and the new expressway is functioning, this information will automatically feed to weigh stations and control rooms in the region, allowing the vehicle identity to be displayed on electronic boards if required to be stopped
  • Ducting for lighting and or any local road electronic control
  • Subsoil drainage to carry ground water away from the sub base of road included.
  • Blackley’s are also installing the ITS junction boxes, rodding eyes for the subsoil drains and core drilling through concrete wingwalls for the subsoil outlets
View Other Projects
https://blackley.co.nz/wp-content/uploads/2020/11/Footer-logo-white.png
213 Stoney Creek Road, RD10, Palmerston North, 4470

Follow us:

FREE CONSULTATION

Copyright © Blackley Construction Ltd.
All rights reserved.

Website by: GSA Design