CivilManawatu District Council – Fagan Rd – New WWPS Storage Chambers

IMG_7550

Installation of new wastewater pump station storage chambers along Fagan Road, utilizing our excavation and construction expertise to install precastconcrete chambers providing essential storage capacity. Our crews trenched and installed inlet and outlet pipework, integrated the chambers with the existing pump station infrastructure, and ensured all connections were watertight and compliant. The additional storage manages peak wastewater flows, reduces pump cycling frequency, and improves the overall efficiency and reliability of the wastewater collection system while reducing wear on pumping equipment and power consumption.

https://blackley.co.nz/wp-content/uploads/2020/11/Footer-logo-white.png
213 Stoney Creek Road, RD10, Palmerston North, 4470

Follow us:

FREE CONSULTATION

Copyright © Blackley Construction Ltd.
All rights reserved.

Website by: GSA Design