CivilNew Culvert Structure for Private Development – Woodville

1000000254-edited

We constructed a new major structure to service private development in Woodville. Utilizing our specialized excavation and pipe-laying expertise, we installed the culvert structure ensuring adequate stormwater conveyance capacity and compliance with Horizon Regional Council requirements. The successful delivery of this project relied on a high level of integration and clear, consistent communication among all stakeholders to ensure that strict environmental controls were upheld throughout the works. A key focus was the protection of the existing stream environment, which supports a range of natural species and required sensitive management practices to avoid disturbance and safeguard ecological values. Comprehensive mitigation measures were implemented to maintain water quality, manage sediment, and preserve habitat integrity while construction activities progressed. At the same time, the project team worked to deliver a robust and sustainable infrastructure solution that not only met current development needs but also provided reliable long-term performance for the new subdivision. By balancing environmental protection with engineering excellence, the project achieved its objectives in a way that supports both community growth and ecological resilience.

https://blackley.co.nz/wp-content/uploads/2020/11/Footer-logo-white.png
213 Stoney Creek Road, RD10, Palmerston North, 4470

Follow us:

FREE CONSULTATION

Copyright © Blackley Construction Ltd.
All rights reserved.

Website by: GSA Design